EN Book a demo

Status and roadmap

Where NEXZOS stands today

What we sell today is a working environment under construction, and that is what we call it. This page exists because a buyer who has to dig this out alone becomes, rightly, suspicious.

DevelopmentPhases 1 to 3 complete, GDPR-by-design included
RemainingPhases 4 and 5, three to five months
In productionThe first one is still open, and we say so
ReleasesA major release about every four years, inside support
Two colleagues reviewing something on a monitor in a modern office

What runs today

A working environment: development phases 1 to 3 are complete, phases 4 and 5 are under way. The development phase that built privacy into the architecture is finished. There is a demo you can see live.

What is still to come

The first organisation in production is still to start, so a reference customer to ring arrives only after the first pilots. That is deliberate: we develop the rest together with the organisations that join first.

What that means for you. You are buying an assessment, then a pilot, and only then a rollout, with a real decision to continue or stop after each step.

Maturity

Three levels of maturity

A working operating system, an independently validated one and one supported in production are three different things. This is where NEXZOS stands, and we keep the three apart on every page.

  1. Today

    Working environment

    Development phases 1 to 3 complete, phases 4 and 5 under way. A live demo on request.

    We are here
  2. Next step

    Independently validated

    Pilot results at the first organisations, an independent security test and the ISO 27001 programme. Pilots planned for Q1 to Q2 2027.

  3. After that

    Supported in production

    The first organisation in production under published support terms, then the wider rollout from 2029.

Timeline

PeriodWhat happens
Q4 2026Technical briefings, assessments, first pilot agreements
Q1-Q2 2027Pilots at the first organisations, decision on continuation
2027-2028Development against those organisations' requirements, certification
Oct 2028Windows 10 ESU ends for good
From 2029Wider rollout

Roadmap status per item

ItemWhat it coversStatus
Development phases 1 to 3Base system, privacy built into the architectureComplete
Development phases 4 and 5Core platform, security validation, application compatibilityUnder way, three to five months
Entra ID and Active Directory single sign-onLogin with existing accounts and groupsPlanned
Device managementPolicies, inventory and reports comparable to IntunePlanned
Security layer with EDR and loggingDetection on the workstation, logs to your own SOCPlanned
Citrix Workspace and VDI clientPublished Windows applicationsPlanned
Office layerCollabora and Microsoft 365 in the browserPlanned
Printing, scanning, smartcards and RijkspasOffice devices and smartcard loginPlanned
VPN, Wi-Fi certificates and disk encryptionHome and office under the same rulesPlanned
Update channel and rollbackControlled updates with a way backPlanned
ISO 27001Information security certificationProgramme in preparation
First organisation in productionA reference customer you can callOpen

A line moves only after it has been tested at a customer. Details per integration on the product roadmap.

Straight about where we stand

What we commit to

You would find these out anyway, so here they are in our own words. Each one is a reason to keep the first steps small, which is exactly how the route above is built.

The first organisation in production is still to start

NEXZOS runs today as a working environment, with development phases 1 to 3 complete. The first organisation in production is still to start. That is precisely why the route starts with a report and with a pilot beside your existing estate, rather than with a replacement.

ISO 27001: programme in preparation

The certification is still under way. What we can put in front of your security officer today is the architecture, the data flows and the update route, and a source audit can be arranged.

GDPR-by-design with the certification in preparation

Data protection was part of the development phase. How compliant the end result is depends on how you configure and use it, so the assessment carries a data protection section written with your own privacy officer, including input for a DPIA. Nobody can sell you compliance as a product.

Escrow · audit · exit are offers

They can be arranged and recorded in the contract. They are offers to be arranged with the agreement, and we would rather say that here than have you discover it during the contract review.

The figures stay ranges until they are yours

Software cost from 40 per cent lower, hardware life 35 to 50 per cent longer. Those are the ranges we work with. They become numbers when they are recalculated on your own estate during the assessment, and they may well land at the bottom of the range.

The ESU comparison has a break even

A pilot pays the migration once, so over three years it stays above the Windows 10 Extended Security Updates you can still avoid, at every pilot size up to 100 workstations, assessment fee included. Over five years, once ESU has ended and Windows has to be bought again, the pilot comes out lower from 54 workstations. Below that a pilot is proof rather than a saving, and the case rests on hardware life, data location and supplier jurisdiction. The rollout that follows costs licence plus rollout work per workstation, and that is where the saving arrives. The quotation builder on the pricing page shows which side of the line you are on.

NEXZOS